summaryrefslogtreecommitdiffstats
path: root/Help/command/include_external_msproject.rst
diff options
context:
space:
mode:
authorBrad King <brad.king@kitware.com>2016-03-09 14:42:18 (GMT)
committerBrad King <brad.king@kitware.com>2016-03-09 14:42:18 (GMT)
commitb42866a34a742f89a35382d17d58070c73486d92 (patch)
tree5728aef86df7ff0d6a677875b442d12147da2e46 /Help/command/include_external_msproject.rst
parentcd9ba3ec453d547b15ab761e20793a1a17bbbd8d (diff)
downloadCMake-b42866a34a742f89a35382d17d58070c73486d92.zip
CMake-b42866a34a742f89a35382d17d58070c73486d92.tar.gz
CMake-b42866a34a742f89a35382d17d58070c73486d92.tar.bz2
Drop Visual Studio 6 generator
This generator has been deprecated since CMake 3.3. Remove it. Update documentation, modules, and tests to drop content specific to this generator.
Diffstat (limited to 'Help/command/include_external_msproject.rst')
-rw-r--r--Help/command/include_external_msproject.rst3
1 files changed, 1 insertions, 2 deletions
diff --git a/Help/command/include_external_msproject.rst b/Help/command/include_external_msproject.rst
index 595762d..18a2b50 100644
--- a/Help/command/include_external_msproject.rst
+++ b/Help/command/include_external_msproject.rst
@@ -19,5 +19,4 @@ command to make things depend on the external project.
``TYPE``, ``GUID`` and ``PLATFORM`` are optional parameters that allow one to
specify the type of project, id (GUID) of the project and the name of
the target platform. This is useful for projects requiring values
-other than the default (e.g. WIX projects). These options are not
-supported by the Visual Studio 6 generator.
+other than the default (e.g. WIX projects).