summaryrefslogtreecommitdiffstats
path: root/Help/command/include_external_msproject.rst
diff options
context:
space:
mode:
authorNikita Nemkin <nikita@nemkin.ru>2020-11-07 20:30:30 (GMT)
committerNikita Nemkin <nikita@nemkin.ru>2020-11-09 15:51:57 (GMT)
commitc705279bae45c85b689febd66d5437d9ec05c9b9 (patch)
treef64bca14f17a902a96d67a30357df3d1e6c745eb /Help/command/include_external_msproject.rst
parent63a1917d098922b59bbba8fdeb42519363d5ba0d (diff)
downloadCMake-c705279bae45c85b689febd66d5437d9ec05c9b9.zip
CMake-c705279bae45c85b689febd66d5437d9ec05c9b9.tar.gz
CMake-c705279bae45c85b689febd66d5437d9ec05c9b9.tar.bz2
Help: Add `.. versionadded` directives to commands documentation
This change ony concerns directives that appear in the document body. The guidelines for inserting version directives: * Baseline version is CMake 3.0, i.e. directives start at 3.1. * Always use `.. versionadded::` directive, avoid ad-hoc version references. Exception: policy pages. * For new command signatures, put `versionadded` on a separate line after the signature. * For a group of new signatures in a new document section, a single version note at the beginning of the section is sufficient. * For new options, put `versionadded` on a separate line before option description. * If all the option descriptions in the list are short one-liners, it's fine to put `versionadded` on the same line as the description. * If multiple option descriptions in close proximity would have the same ..versionadded directive, consider adding a single directive after the list, mentioning all added options. * For compact value lists and sub-option lists, put a single `versionadded` directive after the list mentioning all additions. * When a change is described in a single paragraph, put `versionadded` into that paragraph. * When only part of the paragraph has changed, separate the changed part if it doesn't break the flow. Otherwise, write a follow-up clarification paragraph and apply version directive to that. * When multiple version directives are close by, order earlier additions before later additions. * Indent related lists and code blocks to include them in the scope of `versionadded` directive. Issue: #19715
Diffstat (limited to 'Help/command/include_external_msproject.rst')
-rw-r--r--Help/command/include_external_msproject.rst7
1 files changed, 4 insertions, 3 deletions
diff --git a/Help/command/include_external_msproject.rst b/Help/command/include_external_msproject.rst
index 540a13a..4354654 100644
--- a/Help/command/include_external_msproject.rst
+++ b/Help/command/include_external_msproject.rst
@@ -21,6 +21,7 @@ specify the type of project, id (``GUID``) of the project and the name of
the target platform. This is useful for projects requiring values
other than the default (e.g. WIX projects).
-If the imported project has different configuration names than the
-current project, set the :prop_tgt:`MAP_IMPORTED_CONFIG_<CONFIG>`
-target property to specify the mapping.
+.. versionadded:: 3.9
+ If the imported project has different configuration names than the
+ current project, set the :prop_tgt:`MAP_IMPORTED_CONFIG_<CONFIG>`
+ target property to specify the mapping.