diff options
author | Brad King <brad.king@kitware.com> | 2022-10-27 16:39:06 (GMT) |
---|---|---|
committer | Brad King <brad.king@kitware.com> | 2022-10-27 16:39:06 (GMT) |
commit | 919ab832e848a4d1ae8b1b0d9960e706bff60c3b (patch) | |
tree | bdb815bf966cf535c08cf48c82156b538ad7d457 /Tests/RunCMake/include_external_msproject/VSCSharpReference-check.cmake | |
parent | 33d610a07695ca4716e376d7411845ccd894c6c0 (diff) | |
download | CMake-919ab832e848a4d1ae8b1b0d9960e706bff60c3b.zip CMake-919ab832e848a4d1ae8b1b0d9960e706bff60c3b.tar.gz CMake-919ab832e848a4d1ae8b1b0d9960e706bff60c3b.tar.bz2 |
FindGLUT: Fix regression when pkg-config is not available
In commit a2fc4b6257 (FindGLUT: Drop the now-unnecessary exclusion of
pkg-config for multiconfig, 2022-10-13, v3.25.0-rc2~16^2) we
accidentally removed the entire condition around the `pkg-config` code
path instead of just the multi-config part.
Fixes: #24095
Diffstat (limited to 'Tests/RunCMake/include_external_msproject/VSCSharpReference-check.cmake')
0 files changed, 0 insertions, 0 deletions