diff options
author | Brad King <brad.king@kitware.com> | 2019-01-09 19:30:10 (GMT) |
---|---|---|
committer | Brad King <brad.king@kitware.com> | 2019-01-11 16:04:51 (GMT) |
commit | 57e48f16f2c3b73fb27057267c8092a41005bb75 (patch) | |
tree | a4ffcf1bb1bcb8186ca7504cadd1ad5618852f50 /Tests/RunCMake/include_external_msproject/check_utils.cmake | |
parent | bdef729646a5a559c295ef9c0fb83eb8a6b34905 (diff) | |
download | CMake-57e48f16f2c3b73fb27057267c8092a41005bb75.zip CMake-57e48f16f2c3b73fb27057267c8092a41005bb75.tar.gz CMake-57e48f16f2c3b73fb27057267c8092a41005bb75.tar.bz2 |
VS: Add Visual Studio 16 2019 generator
Add this generator *without* support for specifying the target
architecture in the generator name. cmake-gui will be taught
to provide a field for this, and command-line builds can use -A.
Also, teach this generator to select a default target architecture
based on the host architecture.
Fixes: #18689
Inspired-by: Egor Pugin <egor.pugin@gmail.com>
Diffstat (limited to 'Tests/RunCMake/include_external_msproject/check_utils.cmake')
-rw-r--r-- | Tests/RunCMake/include_external_msproject/check_utils.cmake | 2 |
1 files changed, 2 insertions, 0 deletions
diff --git a/Tests/RunCMake/include_external_msproject/check_utils.cmake b/Tests/RunCMake/include_external_msproject/check_utils.cmake index e9e9cac..0a2ba63 100644 --- a/Tests/RunCMake/include_external_msproject/check_utils.cmake +++ b/Tests/RunCMake/include_external_msproject/check_utils.cmake @@ -100,6 +100,8 @@ function(check_project test name guid type platform imported_release_config_name set(platform "${RunCMake_GENERATOR_PLATFORM}") elseif("${RunCMake_GENERATOR}" MATCHES "Win64") set(platform "x64") + elseif(VS_PLATFORM_NAME) + set(platform "${VS_PLATFORM_NAME}") else() set(platform "Win32") endif() |