summaryrefslogtreecommitdiffstats
path: root/Tests/RunCMake/include_external_msproject/main.cpp
diff options
context:
space:
mode:
authorAlex Turbov <i.zaufi@gmail.com>2019-07-16 16:19:10 (GMT)
committerAlex Turbov <i.zaufi@gmail.com>2019-07-21 23:01:44 (GMT)
commit5f96601675b7b4c1b8d609f31ce39ce35a96a1a5 (patch)
tree47aef0fa10e453781f79f134e4ea0cc7c40a936c /Tests/RunCMake/include_external_msproject/main.cpp
parentf374ffb14b3e55bbee8e7bb0eb3e5a33ee3612f1 (diff)
downloadCMake-5f96601675b7b4c1b8d609f31ce39ce35a96a1a5.zip
CMake-5f96601675b7b4c1b8d609f31ce39ce35a96a1a5.tar.gz
CMake-5f96601675b7b4c1b8d609f31ce39ce35a96a1a5.tar.bz2
CPack: Introduce CPACK_INSTALL_SCRIPTS variable
The singular name `CPACK_INSTALL_SCRIPT` has existed but was not linked from the CPack documentation. Also, it supported multiple values and should have had a plural name. Add a plural-named alternative now. If both `CPACK_INSTALL_SCRIPTS` and `CPACK_INSTALL_SCRIPT` are set then ignore the latter with a warning. Signed-off-by: Alex Turbov <i.zaufi@gmail.com>
Diffstat (limited to 'Tests/RunCMake/include_external_msproject/main.cpp')
0 files changed, 0 insertions, 0 deletions