diff options
author | Brad King <brad.king@kitware.com> | 2014-01-07 14:39:22 (GMT) |
---|---|---|
committer | CMake Topic Stage <kwrobot@kitware.com> | 2014-01-07 14:39:22 (GMT) |
commit | 855e8759fdf20a209f19f02e8dc5d203f4713a6a (patch) | |
tree | db9481bddcca00eaa5f5da2b632c23f7453125ac /Tests/RunCMake/include_external_msproject | |
parent | f74b607aa3aaf4910b824bca09b0a369dbc57ee9 (diff) | |
parent | 3917d86b261f0b88eb5cf0e8d2700c70cebdbe4b (diff) | |
download | CMake-855e8759fdf20a209f19f02e8dc5d203f4713a6a.zip CMake-855e8759fdf20a209f19f02e8dc5d203f4713a6a.tar.gz CMake-855e8759fdf20a209f19f02e8dc5d203f4713a6a.tar.bz2 |
Merge topic 'minor-cleanups'
3917d86 Genex: Add a nullary form for CONFIG
5169130 Help: Document the target properties exported to IMPORTED targets.
ee21f1c CompatibleInterface: Test debugging of not-set property.
80e9fe9 Help: Note that language-specific 'built-ins' are set by the project command.
0b5bf8a Help: Mention CMAKE_DISABLE_FIND_PACKAGE_<PackageName> in package docs.
28c865b Tests: simplify Qt4 target usage
6cfe6b8 Help: Fix typo: 'target' -> 'target property'
b7deca4 Test: Remove obsolete commented code.
9c9f69f Genex: Make EQUAL support upper case binary literals
6eb3218 Genex: Fix case of methods in the dag checker.
646c6ec Genex: Use a preprocessor loop to implement transitive DAG check.
711fb38 Genex: List transitive properties and methods as a table, not two lists.
802a28f Add cmHasLiteralSuffix API.
Diffstat (limited to 'Tests/RunCMake/include_external_msproject')
0 files changed, 0 insertions, 0 deletions