summaryrefslogtreecommitdiffstats
path: root/Help/command/include_external_msproject.rst
Commit message (Collapse)AuthorAgeFilesLines
* Help: Explicitly state include_external_msproject is only for VS generatorsBrad King2024-09-251-4/+5
| | | | Fixes: #19975
* Help: Add `.. versionadded` directives to commands documentationNikita Nemkin2020-11-091-3/+4
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | This change ony concerns directives that appear in the document body. The guidelines for inserting version directives: * Baseline version is CMake 3.0, i.e. directives start at 3.1. * Always use `.. versionadded::` directive, avoid ad-hoc version references. Exception: policy pages. * For new command signatures, put `versionadded` on a separate line after the signature. * For a group of new signatures in a new document section, a single version note at the beginning of the section is sufficient. * For new options, put `versionadded` on a separate line before option description. * If all the option descriptions in the list are short one-liners, it's fine to put `versionadded` on the same line as the description. * If multiple option descriptions in close proximity would have the same ..versionadded directive, consider adding a single directive after the list, mentioning all added options. * For compact value lists and sub-option lists, put a single `versionadded` directive after the list mentioning all additions. * When a change is described in a single paragraph, put `versionadded` into that paragraph. * When only part of the paragraph has changed, separate the changed part if it doesn't break the flow. Otherwise, write a follow-up clarification paragraph and apply version directive to that. * When multiple version directives are close by, order earlier additions before later additions. * Indent related lists and code blocks to include them in the scope of `versionadded` directive. Issue: #19715
* Help: Improve description of modulesBartosz Kosiorek2019-04-231-1/+1
|
* Help: Improve documentation formatingBartosz Kosiorek2019-04-041-1/+1
|
* Help: Apply syntax highlighting to project commandsJoachim Wuttke (o)2018-10-251-1/+1
| | | | | | * Replace most "::" by ".. code-block:: cmake" * Header sentence in imperative voice, detailed command description in present tense.
* include_external_msproject: Honor MAP_IMPORTED_CONFIG_<CONFIG>Beeble2017-04-051-0/+4
| | | | | This allows projects added via `include_external_msproject` to compile the preferred configuration despite different naming conventions.
* Drop Visual Studio 6 generatorBrad King2016-03-091-2/+1
| | | | | | This generator has been deprecated since CMake 3.3. Remove it. Update documentation, modules, and tests to drop content specific to this generator.
* Help: Improve formatting of command documentationMichael Scott2015-06-081-3/+3
| | | | | Use inline reStructuredText markup and add cross-references in more places.
* Convert builtin help to reStructuredText source filesKitware Robot2013-10-151-0/+23
Run the convert-help.bash script to convert documentation: ./convert-help.bash "/path/to/CMake-build/bin" Then remove it.