summaryrefslogtreecommitdiffstats
path: root/doc/img/release-schedule.plantuml
blob: f5aa62a2856fa676b629794d4fc524e672240619 (plain)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
The release timeline was generated on PlantUML (https://plantuml.com)

The current script:

@startuml
title HDF5 Release Schedule

projectscale monthly
Project starts 2021-01-01

[1.8] starts 2021-01-01 and lasts 114 weeks
[1.8.22] happens 2021-02-05
[1.8.23] happens 2022-12-31
[1.8.23] displays on same row as [1.8.22]
[1.8] is colored in #CC6677

[1.10] starts 2021-01-01 and lasts 114 weeks
[1.10.8] happens 2021-10-22
[1.10.9] happens 2022-05-31
[1.10.9] displays on same row as [1.10.8]
[1.10] is colored in #DDCC77

[1.12] starts 2021-01-01 and lasts 114 weeks
[1.12.1] happens 2021-07-01
[1.12.2] happens 2022-04-30
[1.12.2] displays on same row as [1.12.1]
[1.12] is colored in #88CCEE

[1.13] starts 2021-01-01 and lasts 104 weeks
[1.13.0] happens 2021-12-01
[1.13.1] happens 2022-03-02
[1.13.2] happens 2022-06-31
[1.13.3] happens 2022-08-31
[1.13.4] happens 2022-10-31
[1.13.1] displays on same row as [1.13.0]
[1.13.2] displays on same row as [1.13.0]
[1.13.3] displays on same row as [1.13.0]
[1.13.4] displays on same row as [1.13.0]
[1.13] is colored in #44AA99

[1.14] starts at 2022-12-31 and lasts 10 weeks
[1.14.0] happens at 2022-12-31
[1.14] is colored in #AA4499
@enduml