index
:
CMake.git
master
release
CMake is a cross-platform, open-source build system generator.
summary
refs
log
tree
commit
diff
stats
log msg
author
committer
range
path:
root
/
Tests
/
RunCMake
/
include_external_msproject
Commit message (
Expand
)
Author
Age
Files
Lines
*
VS: Fix SLNX generation so .NET Core projects build in the IDE
Brad King
3 days
1
-0/+1
*
VS: Add include_external_msproject GUIDs for more project types
Brad King
3 days
5
-0/+58
*
VS: Add include_external_msproject detection of `.njsproj` type
Brad King
3 days
3
-0/+6
*
Tests: Fix RunCMake.include_external_msproject .sln check failure
Brad King
3 days
1
-11/+5
*
VS: Add include_external_msproject detection of `.wapproj` type
Brad King
2025-11-18
3
-0/+6
*
VS: Add SLNX project types
Brad King
2025-11-18
5
-22/+22
*
VS: Add SLNX default startup project
Brad King
2025-11-14
5
-5/+5
*
VS: Fix SLNX with multiple solution-to-project configuration mappings
Brad King
2025-11-13
2
-2/+8
*
VS: Fix SLNX generation so CSharp projects build in the IDE
Brad King
2025-10-24
1
-0/+1
*
VS: Restore include_external_msproject type detection
Brad King
2025-09-29
5
-0/+69
*
VS: Generate .slnx files for VS 2026
Brad King
2025-09-18
9
-4/+106
*
Tests/RunCMake: Factor out sln-format check scripts
Brad King
2025-09-18
8
-4/+8
*
Tests/RunCMake: Update cmake_minimum_required versions to 3.10
Brad King
2024-10-03
1
-1/+1
*
Tests: Avoid running VS 16+ tests when using a pre-v140 toolset
Brad King
2024-05-13
1
-1/+2
*
Drop Visual Studio 9 2008 generator
Brad King
2024-05-08
1
-1/+1
*
Tests/RunCMake: Update cmake_minimum_required versions
Brad King
2023-02-11
1
-1/+1
*
VS: Exclude ZERO_CHECK.proj from .sln for include_external_msproject
Sumit Bhardwaj
2022-07-20
4
-0/+43
*
Tests/include_external_msproject: Check C# project reference
Dario Passet
2021-05-13
3
-0/+47
*
Fix typos identified using codespell
Jean-Christophe Fillion-Robin
2020-07-22
1
-1/+1
*
Tests/RunCMake: Update cmake_minimum_required versions
Brad King
2020-06-18
1
-1/+1
*
VS: Add support for .NET Standard and .NET Core
Joerg Bornemann
2020-01-24
3
-0/+30
*
VS: Add Visual Studio 16 2019 generator
Brad King
2019-01-11
1
-0/+2
*
include_external_msproject: Honor MAP_IMPORTED_CONFIG_<CONFIG>
Beeble
2017-04-05
7
-4/+34
*
Use string(APPEND) in Tests
Daniel Pfeifer
2016-07-27
1
-3/+3
*
Tests: Add generator platform support
Brad King
2014-09-10
1
-1/+3
*
Cygwin: Avoid legacy warnings in RunCMake.* tests
Brad King
2013-08-13
1
-1/+1
*
Remove CMake-language block-end command arguments
Kitware Robot
2012-08-13
1
-10/+10
*
include_external_msproject: Test TYPE, GUID, PLATFORM options (#13120)
Brad King
2012-04-19
10
-0/+134